In 16 lectures we analyze the methods and rules concerning the awarding of construction works and construction supervision (quality control).
The aim of the course is to obtain knowledge of the basic structures and their application on
a) the awarding of construction works: procurement procedures according to ÖN A 2050 and BVergG,
b) the quality control of construction works: local site supervision, safety on construction sites,
c) scheduling and cost planning: critical path analysis, element costing.
Introduction to the contents and aims of the course, script, literature.
V01: phases of planning and construction processes, scope of services, interfaces and communication between the parties involved (client, architect, planners, construction companies). Performance and remuneration models in architecture and engineering.
V02: basics of scheduling: types of schedules, critical path analysis, workflow planning and time management.
V03: basics of cost planning: cost calculation with parameters, element costing according to ÖN B 1801-1.
V04: construction contract: types of tenders for construction and delivery performances according to ÖN A 2050 and BVergG 2017, structure, procedural and contractual provisions, technical clauses, technical specifications, ÖNorm B 2110, norms on contracts for work B 22xx and H22xx, VOB.
V06: service description: data structur according to ÖN A 2063, specifications, constructional vs. functional specifications, examples, quantity calculation, data exchange, AVA programs, electronic signature,
V07: best bid vs. lowest bid procedures, eligibility, selection and award criteria, tender, examination of tenders, determination of the best bidder, award, legal authorities according to BVergG.
V08: site supervision: tasks and methods of site supervision, coordinates and quality control of construction works, delay.
V09: examination of measurement and accounting, formal takeover, warranty, correction of defects, sample letters, risks. safety on construction sites according to BauKG: coordination of planning and on-site, SiGe-Plan, documents for subsequent works.
V10: basics of cost calculation according to ÖN B 2061, K-sheets (K3, K4, K6, K7), price conversion according to ÖN B 2111, subsequent audit.
PRIEBERNIG: KONSTRUIEREN+BAUEN . AVA TERMINE KOSTEN ÖBA, TU Verlag, Wien 2015, ISBN 978-3-903024-09-0, www.tuverlag.at, www.grafischeszentrum.com.
Skriptum
PRIEBERNIG: BAUDURCHFÜHRUNG + AVA, TU Verlag, Wien, 2017, www.tuverlag.at, www.grafischeszentrum.com.
Fehlerkorrektur a. d. Seite 151. Zuschlagsentscheidung durch den den AG (Auftraggeber) statt AN (Auftragnehmer).