Comparison of network and substation structures with respect to reliability for the network of Oesterreichische Bundesbahnen
01.07.2010 - 31.12.2011
Auftragsforschungsprojekt
Comparison of network and substation structures with respect to reliability for the network of Oesterreichische Bundesbahnen Evaluation of reliability indices for substation devices of the ÖBB network. Evaluation and comparison of reliabilities of typical substation structures. Elaboration of recommendations for substation design with respect to network parameters like feeder line length and network-structure-density. Reliability analysis for the ÖBB 110-kV- and 55-kV- high-voltage network. Comparison of non-reliability contributions of high-voltage grid and substations. Elaboration of decision-bases for future investments into network expansion.
Personen
Projektleiter_in
Gerhard Theil
(E370)
Projektmitarbeiter_innen
Hans Peter Vetö
(E370)
Institut
E370 - Institute of Energy Systems and Electrical Drives
Contract/collaboration
ÖBB/Infrastruktur
Forschungsschwerpunkte
Sustainable Production and Technologies: 100%
Schlagwörter
Deutsch
Englisch
Netzausbau
network development
Unterwerke
substations
Zuverlässigkeit
Reliability
Publikationen
Publikationsliste