Connecting wind turbines to the Wienstrom-Grid
12.04.2010 - 25.11.2010
Assigned research project
Connecting wind turbines to the Wienstrom-Grid The assessment of installing windturbines is based on the ¿Technisch organisatorischen Regeln¿ (TOR). These rules are studied with regard to critical situations for this specific project. Based on this analysis two alternative concepts for the grid-integration of new turbines are examined. Finally conditions for operating windturbines should be proposed.
People
Project leader
Günther Brauner
(E370)
Project personnel
Martin Boxleitner
(E370)
Christoph Groiß
(E370)
Dietmar Tiefgraber
(E370)
Institute
E370 - Institute of Energy Systems and Electrical Drives
Contract/collaboration
Wienstrom
Research focus
Climate Neutral, Renewable and Conventional Energy Supply Systems: 100%
Keywords
German
English
Windkraftanlagen
wind turbines
Netzanschluss
grid connection