A22/09, Analysis of the concentration and load of hydrogen sulfide (H2S) in the inflow of the waste water treatment plant Linz-Asten and balance of the single sources

21.07.2009 - 31.12.2010
Assigned research project
The target of the project is to detect all the concentrations and loads of the sewer to the waste water treatment plant. Because H2S is fleeting and reacting very quickly with oxygen, the measurement can only take place as samples immediately after taking out. With balance of the measured data the essential sources, the effect of the internal process-water and the effectivity of the H2S-binding chemicals (FeSO4) should be investigated.

People

Project leader

Project personnel

Institute

Contract/collaboration

  • Linz AG

Research focus

  • Environmental Monitoring and Climate Adaptation: 20%
  • Efficient Utilisation of Material Resources: 80%

Keywords

GermanEnglish
Schwefelwasserstoffhydrogen sulfide
Geruchodor problem
Bilanzierungbalance
Kanalsewer
Analyseanalysis

Publications