This study analyses electricity market based requirements for Smart Grids preventing the
installation of rarely utilised backup capacities. Therefore, the simulation model “HiREPS” is
used to derive an optimised future electricity market (including storage options) design. Thus,
realisable capacity savings as well as CO2-reductions are calculated to rate possible
contribution margins for a collectively used Smart Grid infrastructure.