Details on distributed automation systems and automation systems integration (horizontal and vertical integration).
This course addresses specific aspects of vertical integration and horizontal convergence at the management, automation and field level. In parallel, control networks are examined in detail. Special attention will be paid to safety/security aspects and quality of service. Another focus is put on information modeling and interfacing with SCADA system.
The practical part of the course is dedicated to a target station connected via Industrial Ethernet components (PLC programming, integration via OPC (C++/C#), visualization, documentation via lab proocols).
Besides, a term paper has to be written.
Aufwandsabschätzung: 75 Stunden = 3 ECTS
Abgabe von Laborprotokollen; Präsentation der Ergebnisse; Seminar; Test
The student has to be enrolled for at least one of the studies listed below