Bitte warten...
Bitte warten...
English
Hilfe
Login
Forschungsportal
Portal
Suche
Forschungsprofile
Forschungsprojekte
Projektvollmacht
Lehre
Forschung
Organisation
Light development for the soil installation with two switching states during different load
15.01.2007 - 15.03.2007
Auftragsforschungsprojekt
Light development for the soil installation with two switching states during different load. A switching status is placed by direct foot manipulation on the glass area with small load. If the glass area is operated by a larger load, the second switching function is reached.
Personen
Projektleiter_in
Friedrich Bleicher
(E311)
Institut
E311 - Institute of Production Engineering and Photonic Technologies
Contract/collaboration
Kraftwerk Living Technologies
Forschungsschwerpunkte
Sensor Systems: 20%
Computational System Design: 80%
Schlagwörter
Deutsch
Englisch
Beleuchtungstechnik
lighting technology
Sensorik
sensors
Publikationen
Publikationsliste