Please wait...
Please wait...
Deutsch
Help
Login
Research Portal
Portal
Search
Research Profile
Research Projects
Project authority
Lehre
Forschung
Organisation
DACH-project "Utilization period of open graded asphalt surface courses"
11.09.2006 - 31.07.2008
Assigned research project
The use of porous asphalt surface courses is particularly motivated by their large contribution to decrease road traffic noise apart from their drainage effect. Experiences in Austria, Germany and Switzerland did not only show the positive effects of this asphalt construction method, but also many negative effects, for instance their behaviour in winter times (modified winter maintenance, increased salt consumption, icing effect, ..) as well as their worse long-term behaviour compared with conventional surface courses. Within this project the utilization period of porous asphalt surface courses is particularly the center of attention. By the term "utilization period" both the structural and the functional lifetime is ment i.e. the lastingness of the noise-reducing effect and the drainage effect.
People
Project leader
Johann Litzka
(E230)
Institute
E230 - Institute of Transportation
Contract/collaboration
Bundesministerium f. Verkehr, Innovation und Technologie
Research focus
Special and Engineering Materials: 100%
Keywords
German
English
Drainasphalt
Porous asphalt
Lärmschutz
noise abatement
Publications
Publications