Connecting wind turbines to the Wienstrom-Grid
12.04.2010 - 25.11.2010
Auftragsforschungsprojekt
Connecting wind turbines to the Wienstrom-Grid The assessment of installing windturbines is based on the ¿Technisch organisatorischen Regeln¿ (TOR). These rules are studied with regard to critical situations for this specific project. Based on this analysis two alternative concepts for the grid-integration of new turbines are examined. Finally conditions for operating windturbines should be proposed.
Personen
Projektleiter_in
Günther Brauner
(E370)
Projektmitarbeiter_innen
Martin Boxleitner
(E370)
Christoph Groiß
(E370)
Dietmar Tiefgraber
(E370)
Institut
E370 - Institute of Energy Systems and Electrical Drives
Contract/collaboration
Wienstrom
Forschungsschwerpunkte
Climate Neutral, Renewable and Conventional Energy Supply Systems: 100%
Schlagwörter
Deutsch
Englisch
Windkraftanlagen
wind turbines
Netzanschluss
grid connection
Publikationen
Publikationsliste