*

01.01.2014 - 30.06.2014
Auftragsforschungsprojekt

PET to PET Recycling Austria GmbH operates a biological wastewater treatment plant for pretreating the wastewater from the production. As a result of changes in the production process, various adjustments to the wastewater treatment plant were required. The institute advises the company both in optimizing the function of this system, as well as in minimizing the resources (nutrients, energy).

Personen

Projektleiter_in

Projektmitarbeiter_innen

Institut

Contract/collaboration

  • PET to PET Recycling Österreich Gmb

Forschungsschwerpunkte

  • Efficient Utilisation of Material Resources: 100%

Publikationen